This website has been created to provide comprehensive, accurate and timely information for residents of Lyndon Township about the broadband network that is being built in the township,  If you are looking for information that you do not find here or would like to ask a question, please contact us.  


 

 

MEC CONTACT INFORMATION

Quick Links 

Project Updates

Construction update 9-20 to 10-3

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 9/20/2020 through 9/26/2020: Completed splicing in Ellsworth PON Lit Joslin and Ellsworth PONs last Friday Installed 25 home drops in Joslin and Ellsworth PONs (totals to date: 820 drops – 94 in Werkner PON, 72 in Island Lake PON, 87 in […]

Construction Update 9-13 to 9-26

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 9/13/2020 through 9/19/2020: Continued splicing in Ellsworth PON Installed 35 home drops in Joslin and Ellsworth PONs (totals to date: 795 drops – 94 in Werkner PON, 72 in Island Lake PON, 87 in Central Office PON, 131 in Boyce PON, […]

Construction Update 9-6 to 9-19

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 9/6/2020 through 9/12/2020: Begin splicing in Ellsworth PON Installed 11 home drops in Wild Goose and Ellsworth PONs (totals to date: 760 drops – 94 in Werkner PON, 72 in Island Lake PON, 87 in Central Office PON, 131 in Boyce […]

Construction Update 8-30 to 9-12

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 8/30/2020 through 9/5/2020: Completed splicing in Joslin PON Installed 28 home drops in Bruin, Joslin and Ellsworth PONs (totals to date: 747 drops – 94 in Werkner PON, 72 in Island Lake PON, 87 in Central Office PON, 131 in Boyce […]