This website has been created to provide comprehensive, accurate and timely information for residents of Lyndon Township about the broadband network that is being built in the township,  If you are looking for information that you do not find here or would like to ask a question, please contact us.  


 

 

Quick Links 

Project Updates

Construction Update 11-17 to 11-30

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 11/17 through 11/23: 6 to 8 bore crews on-site plus one fiber pulling crew and one splicing crew. Bored 634 feet on Cedar Drive (Sugarloaf PON) Bored 850 feet on N Territorial Road (Wild Goose PON) Bored 6,744 feet on Hadley […]

Construction Update 11-10 to 11-23

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 11/10 through 11/16: 6 bore crews on-site plus one fiber pulling crew and one splicing crew.  Note: Minimal work on 11/11 and 11/12 due to the snowy and hazardous conditions. Bored 4,037 feet on Waterloo Road (Sugarloaf PON) Bored 300 feet […]

Construction Update 11-3 to 11-16

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 11/3 through 11/9: 9 to 10 bore crews on-site plus one fiber pulling crew and one splicing crew Bored 385 feet on M-52 (Central Office PON) Bored 170 feet on Cooper Ridge Road (Werkner PON) Bored 579 feet on Gaddis Road […]

Construction update 10-27 to 11-9

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 10/27 through 11/2: 8 to 9 bore crews on-site plus one fiber pulling crew and one splicing crew Bored 370 feet on M-52 (Central Office PON) Bored 264 feet on Cassidy Road (Boyce PON) Bored 3,882 feet on Waterloo Road (Sugarloaf […]