This website has been created to provide comprehensive, accurate and timely information for residents of Lyndon Township about the broadband network that is being built in the township, If you are looking for information that you do not find here or would like to ask a question, please contact at: Oversight@lyndonbroadband.org.
Project Updates
Construction Update 11-8 to 11-21
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 11/8/2020 through 11/14/2020: Installed 6 home drops in Central Office, Guinan, Wild Goose and Ellsworth PONs (totals to date: 914 drops – 96 in Werkner PON, 76 in Island Lake PON, 86 in Central Office PON, 128 in Boyce PON, 123 […]
Construction Update 11-1 to 11-14
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 11/1/2020 through 11/7/2020: Installed 2 home drops in Ellsworth PONs (totals to date: 908 drops – 96 in Werkner PON, 76 in Island Lake PON, 85 in Central Office PON, 128 in Boyce PON, 123 in Sugarloaf PON, 42 in Guinan […]
Construction Update 10-25 to 11-7
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 10/25/2020 through 10/31/2020: Installed 6 home drops in Island Lake, Sugarloaf, Joslin and Ellsworth PONs (totals to date: 906 drops – 96 in Werkner PON, 76 in Island Lake PON, 85 in Central Office PON, 128 in Boyce PON, 123 in […]
Construction Update 10-18 to 10-31
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 10/18/2020 through 10/24/2020: Completed home drops! Please note that residents continue to contact MEC to sign-up for service (e.g. resident moved into Township, new home construction) so this number will continue to increase through the years. For the purpose of the […]