Project Updates
Construction Update 8-16 to 8-29
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 8/16/2020 through 8/22/2020: Completed splicing in Bruin PON Continue splicing in Joslin PON Continued restoration activities Began home drops in Bruin PON Installed 21 home drops in Boyce, Sugarloaf, Long Lake, Wild Goose and Bruin PONs (totals to date: 692 drops […]
Construction Update 8-9 to 8-22
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 8/9/2020 through 8/15/2020: Spliced in Bruin and Joslin PONs Continued restoration activities Installed 12 home drops in Island Lake and Wild Goose PONs (totals to date: 671 drops – 93 in Werkner PON, 70 in Island Lake PON, 87 in Central […]
Construction Update 8-2 to 8-15
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 8/2/2020 through 8/8/2020: Worked on main connections in Bruin and Joslin PONs Continued restoration activities Installed 18 home drops in Wild Goose PON (totals to date: 664 drops – 94 in Werkner PON, 70 in Island Lake PON, 90 in Central […]
Construction Update 7-26 to 8-8
Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 7/26/2020 through 8/1/2020: Began splicing in Bruin PON Continued restoration activities Installed 15 home drops in Wild Goose PON (totals to date: 646 drops – 94 in Werkner PON, 70 in Island Lake PON, 90 in Central Office PON, 128 in […]