This website has been created to provide comprehensive, accurate and timely information for residents of Lyndon Township about the broadband network that is being built in the township,  If you are looking for information that you do not find here or would like to ask a question, please contact at:  Oversight@lyndonbroadband.org.  

Lyndon Township Completes Broadband Project

QUICK LINKS

MEC CONTACT INFORMATION

Project Updates

Construction Update 7-14 to 7-27

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 7/14 through 7/20: 6 to 8 bore crews on-site Bored 1,343 feet on Roepke Road (Central Office PON) Bored 4,209 feet on M-52 (Central Office PON) Bored 3,170 feet on Bush Road (Sugarloaf PON) Bored 2,423 feet on Cassidy Road (Boyce […]

MEC July Construction Update

  Over the last month, we installed service in five homes. These are people who are evaluating the installation process and service to provide us with meaningful feedback so that we can ensure the very best service experience for all future customers. Here are just a few comments shared by these folks: “We have been […]

Construction Update 6-30 to 7-20

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 6/30 through 7/13: 4 to 7 bore crews on-site Bored 2,044 feet on Island Lake Point (Island Lake PON) Bored 2,700 feet on North Territorial Road (Island Lake PON) Bored 800 feet on Rex Road (Island Lake PON) Bored 593 feet […]

Construction Update 6-23 to 7-6

Areas referenced below can be located on this map LYNDON DESIGN 110518 Work completed 6/23 through 6/29: 5 bore crews on-site Spliced into house box, installed router, and activated broadband service at 5 beta testers on Werkner Road Bored 1,427 feet on Waterloo Road (Werkner PON) Bored 537 feet on Island Lake Drive (Island Lake […]